InstElectric Pro - Electricity

🇺🇸 United States
Angel Martinez  | 
52
ASO score
Text
74/100
Reviews
0/100
Graphic
60/100
Other
0/100
rating
App Rating
4.4
rating
Votes
35
rating
App Age
7y
rating
Last Update
Dec 29, 2023
rating
iAP
JPY120 - 980

Compare with Category Top Apps

Metrics
Current App
Category Top Average
Difference
Rating
4.42
4.68
-6%
Number of Ratings (Voted)
35
3.3M
-100%
App Age
6y 12m
8y 0m
-13%
Price
$5
$0
In-app Purchases Price
$0
$66
Update Frequency
733d
29d
+2 470%
Title Length
30
23
+30%
Subtitle Length
24
28
-14%
Description Length
3 188
3 097
+3%
Number of Screenshots
2305
1411
+63 %
Size
20MB
282MB
-93 %

Category Ranking in United States

All
New
Trending Up
Trending Down
Top Dec 23, 2025 Dec 30, 2025
No results were found!
Top Dec 23, 2025 Dec 30, 2025
No results were found!
Top Dec 23, 2025 Dec 30, 2025
No results were found!
Top Dec 23, 2025 Dec 30, 2025
No results were found!

Ranking Keywords in United States

Keywords App Rank
Illustration
Analyze this and other apps using Asolytics tools

Text ASO

Title (
Characters: 30 of 30
)
InstElectric Pro - Electricity
Subtitle (
Characters: 24 of 30
)
Electrical installations
Description (
Characters: 3188 of 4000
)
Tool to support the calculation of electrical installations that will allow the user (designer/electrician/technician) to perform electrical calculations easily and quickly. · Dimensioning complete of low voltage circuits with the most frequent installation methods · Phase cable size, neutral, protective conductor · Criteria based on the admissible current of the cable, voltage drop and overcurrent protection · Designation of the most used cables. · Circuits with automatic circuit breaker until In=4000 A (Ir rating setting), maximum fuse In=1600 A (gG type), maximum 12 conductors parallel per phase, maximum size 630 mm² · Short-circuits, including MV network, LV lines and final circuit · Estimate of the maximum short-circuit current (simplified method) · Maximum protected length for minimum short circuit (approximate method) · Earthing system with diferentes types of electrodes (rods, buried conductor, rings and grid) · Distance between the earthing systems · Forecast of loads of a building destined to houses with several sections: dwellings, common services, commercial premises/offices and garage with/without infrastructure for recharging electric vehicles · Reactive power of the capacitor bank for the compensation of the power factor (cos φ) and capacity (µF) of the capacitors · C/K Factor for automatic capacitor bank · Frequency resonance capacitors · Compensation of the power factor for a three-phase transformer · Choice of installation system in the function of the circuit, cable and its situation · Overvoltage due to defects to earth in medium voltage MV depending on the earthing systems · Power in an unbalanced three-phase system · Overvoltages due to loss of neutral conductor, earth fault and short circuit · Electricity parameters of a single-phase or three-phase (balanced) · Transformer performance · Secondary voltage of a transformer acoording to switch position · Distribution of load of transformers in parallel · K-Factor transformer · Current transformer · Verification resistance of the assembly to short-circuits · Dissipated power of a assembly · Size of trays and conduits · Conduits characteristics according to the installation method · Conversions of wire sizes (mm²-awg) and conduits threads · Impedance, resistance and reactance of a cable · Representation of the curves of the protections · International protection IP - IK Parameter settings for calculations: · Constants (voltages, conductivity, temperatures, etc.) that affect electrical calculations · Protections (circuit breakers and fuses) · Selection of minimum rate for circuit-breakers with regulation and maximum cable size for multi-conductor grouping per phase · Method estimation of the reactance · Conductivity of the conductor depending on the current of the circuit (constant, according to the expected current, maximum cable temperature) · Use reduction factors by grouping cables/circuits · Use of factors of diversity/utilization · Reference documents: IEC Standards, REBT (sp), Technical Application Guide, (UE) 2016/364 IN NO CASE SHALL THE AUTHOR BE LIABLE FOR ANY DIRECT OR INDIRECT DAMAGES AS A RESULT OF THE CORRECT OR INCORRECT USE OF THE APPLICATION}
Read more

Visual ASO

Screenshots

Rating & Reviews

Reviews Overview
🧐 Coming Soon…
Rating
4.4
35 voters

Some Latest Reviews

Other

Additional Information
Rating:
4.41
Voted: 35
App Store Link:
Price: 4.99 $
Website: -
Email: -
Privacy Policy:
Categories: Productivity, Utilities
Size: 19MB
iAP: 120 - 980 JPY
App Age: 7 years
Release Date: Jan 04, 2019
Last Update: Dec 29, 2023
Version: 2.9.1
Version history
2.9.1
Dec 29, 2023
* Minor fixes and performance improvements
2.9.0
May 03, 2023
- Fixes and improvements in curves and index IP - IK
Version history