Version history
Landlords Electrical Checklist
61
ASO score
Text
92/100
Reviews
0/100
Graphic
60/100
Other
0/100
App Rating
1
Votes
1
App Age
5y 2m
Last Update
Aug 08, 2025
iAP
$3.99 - 9.99
Compare with Category Top Apps
|
Metrics
|
Current App
|
Category Top Average
|
Difference
|
|---|---|---|---|
|
Rating
|
0
|
4.62
|
|
|
Number of Ratings (Voted)
|
0
|
280.1K
|
|
|
App Age
|
5y 1m
|
6y 4m
|
-19%
|
|
In-app Purchases Price
|
$7
|
$49
|
-86
%
|
|
Update Frequency
|
79d
|
43d
|
+83%
|
|
Title Length
|
30
|
26
|
+15%
|
|
Subtitle Length
|
28
|
28
|
|
|
Description Length
|
2 686
|
2 852
|
-6%
|
|
Number of Screenshots
|
1326
|
1179
|
+12
%
|
|
Size
|
4MB
|
212MB
|
-98
%
|
Category Ranking in United States
7 days
Last 7 days
Last 30 days
Last 90 days
Last 180 days
Last year
| Top | Dec 06, 2025 | Dec 13, 2025 |
|---|---|---|
|
No results were found!
|
||
| Top | Dec 06, 2025 | Dec 13, 2025 |
|---|---|---|
|
No results were found!
|
||
| Top | Dec 06, 2025 | Dec 13, 2025 |
|---|---|---|
|
No results were found!
|
||
| Top | Dec 06, 2025 | Dec 13, 2025 |
|---|---|---|
|
No results were found!
|
||
Ranking Keywords in United States
| Keywords | App Rank |
|---|
Analyze this and other apps using Asolytics tools
Text ASO
Title
(
Characters:
30
of 30
)
Landlords Electrical Checklist
Subtitle
(
Characters:
28
of 30
)
Landlords Interim Inspection
Description
(
Characters:
2686
of 4000
)
This Landlords electrical interim checklist details what to look for to carry out an interim inspection. Split into easy to follow sections, once each task is completed you can select the checklist item item as passed (tick), failed (X) or N/A if not applicable.
Suitable for single-lets, HMO's, holiday-lets, serviced accommodation, private rented accommodation and social housing.
Each interim checklist item describes what to look for for each section / item of the checklist.
This Landlords Interim Electrical Visual Inspection Checklist app solves the issue of providing evidence that the electrical installation is maintained and kept in a safe working order throughout a tenancy, a requirement of the new PRS scheme (Private Rented Sector).
An easy to use electrical checklist app for interim property inspections, generates a PDF certificate/report. For landlords, electricians and letting agents.
At the end of the inspection you can save, print or email a PDF report of the routine check for your records.
BS 7671 IET Wiring Regulations recommend an interim electrical inspection (routine check) is carried out at least every 12 months for all rental properties or at change of tenancy (which ever comes first).
Features:-
Easy to follow checklist
Save, print and email PDF reports
Sign and date reports
Add your own comments
The electrical checklist is split in to 8 easy to navigate sections:
1) Property Details
2) Paperwork
3) Consumer Unit
4) Sockets and Switches
5) Lights
6) Smoke, Heat and Carbon Monoxide Alarms
7) General
8) Additional Comments
With the new mandatory 5 yearly electrical installation condition report ( EICR ) for private rental properties (PRS) is it more important than ever to keep records of these checks for future reference should anything go wrong.
To ensure an electrical installation is continually maintained and kept in a safe working order for continued use a 5 yearly Electrical Installation Condition Report should be carried out at least every 5 years by a suitably skilled electrician, in addition to this an Interim Electrical Visual Inspection should be carried out at least every 12 months and at change of tenancy which is what this app serves.
In addition to having a 5 yearly Electrical Installation Condition Report (EICR) carried out, an Interim Visual Electrical Inspection should be carried out at least every 12 months and at change of tenant.
- Interim Electrical Inspections: 12 months / change of tenancy (which ever comes first),
SOLUTION = This "Landlords Electrical Checklist" App.
- Electrical Installation Condition Report (EICR): Max 5 yearly.
SOLUTION = "Pro Certs" Electrical Certification App.
}
Read more
Other
Additional Information
Version history
1.0.14
Aug 08, 2025
07/08/2025 v1.0.14
- Fixed a PDF generation bug where on occasions page 1 would overwrite the other pages.
1.0.13
Jul 23, 2025
23/07/2025 v1.0.13
- In-App optimisations.
- UI optimisations and improvements.