Uphill Mountain Jeep Driver 3D

🇺🇸 United States
Wolverine Studio  | 
20
ASO score
Text
25/100
Reviews
0/100
Graphic
40/100
Other
0/100
rating
App Rating
3.4
rating
Votes
170.34K
rating
App Age
6y 1m
rating
Last Update
Dec 18, 2025

Compare with Category Top Apps

Metrics
Current App
Category Top Average
Difference
Installs
3.9M
78.9M
-95%
Rating
3.29
4.36
-25%
Number of Ratings (Voted)
117.7K
264.7M
-100%
App Age
6y 0m
5y 0m
+21%
In-app Purchases Price
$0
$91
Update Frequency
35d
69d
-49%
Title Length
30
22
+36%
Short Description Length
75
63
+19%
Description Length
3 339
2 429
+37%
Number of Screenshots
2001
1565
+28 %
Has Video?
No
0% has videos
Size
0MB
0MB

Category Ranking in United States

All
New
Trending Up
Trending Down
Top Dec 21, 2025 Dec 28, 2025
No results were found!
Top Dec 21, 2025 Dec 28, 2025
No results were found!
Top Dec 21, 2025 Dec 28, 2025
No results were found!
Top Dec 21, 2025 Dec 28, 2025
No results were found!

Downloads

Downloads Graph
Downloads icon
Total
3.8M
Last month icon
Last month
116.5K

Text ASO

Title (
Characters: 30 of 50
)
Uphill Mountain Jeep Driver 3D
Short Description (
Characters: 75 of 80
)
Take a ride on 4x4 grand monster jeep & cross the off-road racing game.
Description (
Characters: 3339 of 4000
)
Are you looking for something new to amaze yourself in uphill mountain jeep driver 3D games? Wait is over! Install 4x4 offroad jeep drive and fun drive get a real fun of offroad jeep. Get ready for some adventure. In this mountain uphill climb master adventure you have to show your driving skills in jeep with high speed on road. Have you any experience to drive jeep in high speed if not then we are introducing game having such concept. You have to achieve different targets in time limitation so pick your device install this offroad driving jeep games fun and enjoy it. Get ready to enjoy the real off-road prado and jeep driving games at mountain climb hill to enjoy tricks master impossible ride. Show your off-road 4x4 driving skills while play the game off-road jeep driving 3d and jeep adventure. Off-road land cruiser driving is the real adventure to bring the real off-roading driver in you and challenging game in mountains, hills, desserts. Ever wanted to try a buggy simulation game 2022? Now you can add the luxurious car 4x4 Jeep SUV and experience a sports rally driver in this 4X4 drive: off-road jeep! You will drive car in mountain rocky environments and safari - desert car simulator hill climbs. Beat the impossible race tracks and become the master of off-road land rover driving 2022. 4x4 jeep prado driving game is the newest off-road driving simulation : off-road jeep driving fun. Offroad hill climb simulator is a gift for you in new york 4x4 offroad jeep driving 2022 with real jeep adventure game play. You have the choice of driving 4x4 hummer jeep and the classical SUV jeep. Highway Prado Car Racing : Jeep Sim Offroad 2022: Fasten your seat belt and move on towards your offroad jeep race and enjoy the smooth controls of this addictive offroad sim game. Fasten your seat belt and take steering wheel of jeep off-road simulation 4x4 fast Prado jeep and monster truck to join real stunt adventure 3d 2022 of driving and racing as professional stuntman and extreme tricky driver. Be expert stunt racer of luxury jeep and show your expertise of tricky stunt racing and driving to become pro stunt driver and racer in 4x4 big wheel stunt racing Adventure 2022. It is not like real dubai desert jeep racing game or off-road UAE cruiser Prado race you have to be real stunt master of 4x4 vehicle to play this crazy prado stunt challenge 3d. Burn out your jeep off road stunts top racer car on the hills and perform the best crazy Prado car games as you are the most powerful rider of this drive offroad mountain jeep 3D. Dozens of levels included and many different 4x4 crazy sports cars with vertical ramps, heavy real cars with auto car racing gallium you will drive in this uphill monster jeep racing with passing the parkour stunts. 4x4 offroad jeep game there are a number of expert jeep racers participating in the championship. To challenge the crazy jeep drivers, a difficult curvy mountain track on hilly areas is ready in this mountain 4x4 jeep adventure games. Features: ♦ Newly added stages every 15 days. ♦ Addictive levels that are not boring at all. ♦ Different action starred that come with new levels. ♦ High-quality and ever-changing environment models. ♦ An environment where the physics laws completely prevail! ♦ Modify some specifications of cars such as handling, motor and brake.}
Read more

Visual ASO

Screenshots

Rating & Reviews

Reviews Overview
🧐 Coming Soon…
Rating
3.4
170 342 voters

Some Latest Reviews

Evaline Nongbet
15 Dec, 2025
5
I am very happy to play this game because it gives me a lot of experience in driving like a real car
Lo Ca
30 Oct, 2025
2
installé et aussi tôt désinstallé il y a beaucoup trop de pub pendant les partie ce qui cache une parti de l'écran
Patos Piaui
27 Oct, 2025
1
não condiz com o mostrado no anúncio portanto propaganda enganosa não instalem perca de tempo
Daksh Mor
20 Sep, 2025
1
ak be badiya chege kone ha😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂
Thinh Truong
17 Sep, 2025
5
tôi đã từng làm lộ rõ bản lĩnh chính của bạn và xã và nướng và bánh top model bị game online
dziphathutshedzo Ndwamato
23 Aug, 2025
1
the game is not at the pictures on the pictures is a cool game but when u enter the game it looks like it was made from a grade R learner
Sahil Shaikh
16 Jun, 2025
1
This is a completely useless game. More than a game, it is an ads game.
Rajendra Baiga
28 Apr, 2025
1
This is the worst game, open it now, there are always too many ads, it's a rubbish game. It takes 10 minutes to open the game,
Kwandile SK Magwaza
21 Apr, 2025
1
worst game ever , just a bunch of ads and nothing like the images they desplayed😔

Other

Additional Information
Rating:
3.43
Voted: 170.34K
Google Play Link:
Website:
Email: -
Privacy Policy:
Categories: Strategy
Size: -
Installs: 3.79M
App Age: 6 years 1 month
Release Date: Dec 09, 2019
Last Update: Dec 18, 2025
Version: 0.34
Version history
0.34
Dec 18, 2025
0.33
Dec 10, 2025
Version history